SERVICE POINTS 21: VERY STRICT REQUIREMENTS APPLY IF YOU WANT TO AGREE AN EXTENSION OF TIME: THEY HAVE TO BE IN WRITING AND THEY HAVE TO BE TOTALLY CLEAR AS TO DATES…
We are looking at the same case again here, but from a slightly different angle. This relates to written agreements to vary court orders. Firstly the agreements have to be in writing; secondly they have to be totally clear as…
SERVICE POINTS 18: DECISION TODAY: THE CLAIMANT DID NOT ACTUALLY RECEIVE THE CLAIM FORM UNTIL AFTER IT EXPIRED, YET THE COURT OF APPEAL WAS UNYIELDING
We are continuing our examination of the Court of Appeal judgment today in relation to service of the claim form. The claimant’s solicitors received the claim form after the date it had expired. Nevertheless the Court of Appeal upheld the…
SERVICE POINTS 6: THERE ARE NO EASILY ACCESSIBLE “BACKDOOR” METHODS FOR CIRUMVENTING THE RULES RELATING TO APPLICATIONS FOR RETROSPECTIVE SERVICE
It may not have escaped reader’s notice that we have already started the month by looking at a case about defects in the service of the claim form. The claimants in that case (which was said to be a £22…
SERVICE POINTS 5: CLAIMANTS IN £22 MILLION CLAIM FAIL ON SERVICE ISSUES – FOR THE THIRD TIME: ORDERS GRANTING EXTENSIONS OF TIME SET ASIDE
Here we look at a case where the claimants came to grief on issues relating to service – extensions of time for service of the claim form were set aside. One remarkable feature of this litigation is that this was…
ORDERS EXTENDING TIME FOR SERVICE OF THE CLAIM FORM SET ASIDE: THE DUTIES OF THE APPLICANT WERE NOT COMPLIED WITH: THE CLAIMANT COMES TO GRIEF
If there is any application that should make a claimant’s lawyer extremely uncomfortable it is making a without notice application to extend time for service of the claim form. If you add to this an application (made late) for permission…
HOW SHOULD THE COURT EXERCISE ITS DISCRETION TO CASE MANAGE ACTIONS ONCE PART 8 PROCEEDINGS ARE ISSUED UNDER THE PAP? COURT OF APPEAL GIVES CLEAR GUIDANCE
Having determined that the court does have jurisdiction to case manage actions issued under Part 8 the Court of Appeal went on to make some trenchant observations in relation to avoiding the possibility of delay. (Applications to extend a stay…
THE JUDGE’S DECISION TO GRANT RELIEF FROM SANCTIONS TO A DEFENDANT WAS APPROPRIATE: SOME WORDS AS TO HOW PEREMPTORY ORDERS SHOULD BE DRAFTED.
Today we are looking at a case where the Court of Appeal upheld a decision granting a defendant relief from sanctions. However this is a case of “two halves” in that the claimant had a more favourable decision in relation…
DEFENDANT GRANTED AN EXTENSION OF TIME TO FILE A DEFENCE : “I AM IN NO DOUBT THAT I SHOULD GRANT THE RETROSPECTIVE APPLICATION OF OF ONE DAY…”
In Ahmad v Comptroller-General of Patents, Designs and Trade Marks [2025] EWHC 936 (Pat) Mr Justice Mellor granted the defendant an extension of one day to file a defence, this had the effect of making the defendant’s applications to strike…
APPELLANT FILED APPEAL WITH TWO MINUTES TO SPARE: HOWEVER IT WAS FILED IMPROPERLY AND THE APPEAL DISMISSED: THE DANGERS OF HYPERLINKS…
The judgment of Mr Justice Dexter Dias in Kumar v The General Medical Council (Rev1) [2025] EWHC 820 (Admin) contains an important lesson for all litigants. An appellant left filing a notice of appeal until two minutes before the expiry…
THE DENTON PRINCIPLES AND EXTENSIONS OF TIME TO APPEAL (AGAIN): DELAYS REQUIRE AN EXPLANATION – NOT A CHRONOLOGY
The judgment of HHJ Karen Walden-Smith in Khan & Anor v Secretary of State for Housing, Communities and Local Government & Anor [2025] EWHC 969 (Admin) is the second example this week of the court considering the Denton principles when…
THE DENTON PRINCIPLES: RELIEF FROM SANCTIONS AND EXTENSIONS OF TIME TO APPEAL: A “NUANCED APPROACH” IS REQUIRED
In Yaxley-Lennon v HM Solicitor General [2025] EWCA Civ 476 the Court of Appeal considered the Denton principles in the context of extending time for permission to appeal. The case emphasises that the absence of a good reason for default…
TIME FOR PERMISSION TO APPEAL: A “SECOND APPEAL”: COURT REFUSES TO GRANT EXTENSION
For the second time this week we are looking at issues relating to extension of time and appeals. In Abbotsley Ltd v Pheasantland Ltd [2025] EWHC 654 (KB) HHJ Karen Walden-Smith provided a timely reminder that a party who wishes…
“A TRAP FOR THE UNWARY”: WHEN DOES TIME FOR APPEALING START TO RUN WHEN A JUDGMENT IS SENT OUT? CLARITY IS ESSENTIAL
The judgment of Mr Justice Hayden in F (A Minor) (Permission To Appeal) [2025] EWHC 638 (Fam) highlights a trap for those seeking permission to appeal. The time for appealing runs from the date that the order was announced and…
THE COURT SETS ASIDE AN ORDER EXTENDING TIME FOR SERVICE OF THE CLAIM FORM: ACTION AGAINST THAT DEFENDANT DISMISSED
One of the issues considered by Mrs Justice Bacon in Vauxhall Motors Ltd & Ors v Denso Automotive UK Ltd & Ors [2025] EWHC 213 (Ch) was whether an order extending time for service of the claim form should be…
DENTON DID NOT APPLY TO THE DEFENDANT’S APPLICATION FOR AN EXTENSION OF TIME: HOWEVER – CONSIDERING THE OVERRIDING OBJECTIVE – THE APPLICATION WAS REFUSED
In Bailey & Ors v GlaxoSmithKline UK Ltd [2025] EWHC 186 (KB) Mr Justice Bourne considered whether the defendant should have an extension of time. The judge considered whether the “Denton” principles apply to the defendant’s application and if not…
SEEKING PERMISSION TO APPEAL: WHEN IS THERE AN “ADJOURNED HEARING”? THE ISSUES CONSIDERED
The question of when a hearing has been adjourned and when time starts running for applying to the trial judge for permission to appeal was considered by Mr Justice Freedman in Mex Group Worldwide Limited v Stewart Owen Ford & Ors [2024]…
“PROFESSIONALISM DEMANDS THAT LAWYERS PICK THEIR BATTLES WISELY”: JUDGE GRANTS EXTENSION AND ORDERS THE LAWYERS TO GO TO LUNCH TOGETHER…
Coming to the end of the year, and with Christmas nearly upon us, all lawyers could benefit from reading the judgment of Chief U.S. District Judge David Proctor in McCullers v. Koch Foods of Ala., LLC in 2024 WL 4907226…
IT IS NEVER TOO LATE IN THE YEAR FOR A NEW CLAIM FORM CASE: COURT OF APPEAL OVERTURN ORDER EXTENDING TIME FOR SERVICE
In Secretary of State for Levelling Up, Housing and Communities v Rogers [2024] EWCA Civ 1554 the Court of Appeal overturned a decision that granted a claimant an extension of time for service of the claim form. The case is…
ITS NOT TOO LATE IN THE YEAR FOR “CLAIM FORM” CASES: JUDGE ALLOWS APPEAL AND GRANTS CLAIMANT EXTENSION OF TIME TO SERVE THE PARTICULARS OF CLAIM: CPR 3.9 & DENTON DID NOT APPLY
I am grateful to solicitor Chris Topping of Broudie Jackson Canter for sending me a copy of the judgment of HHJ Bird in Brown -v- the Chief Constable of Greater Manchester Police (5th December 2024). The judge allowed an appeal against the…
COURT OF APPEAL FIND THAT JUDGE SHOULD NOT HAVE GRANTED RELIEF FROM SANCTION FOLLOWING LATE SERVICE OF THE PARTICULARS OF CLAIM
In the judgment today in Bangs v FM Conway Ltd [2024] EWCA Civ 1461 the Court of Appeal overturned a decision where the claimant had been given relief from sanctions against one defendant following late service of the Particulars of…
DEFENDANTS OBTAIN EXTRA TIME TO COMPLY WITH PEREMPTORY ORDER: CPR 3.(2)(a) CONSIDERED
In Ahmad v Ouajjou & Anor [2024] EWHC 2659 (Comm) Mr Justice Bryan granted the defendant an extension of time to comply with a peremptory order to pay costs. The application was made “ahead of time”. CPR 3.9 did not…
ANOTHER LATE CLAIM FORM CASE: COURT HAD NO POWER TO EXTEND TIME: IF IT DID THEN THE CLAIMANT’S APPLICATION WOULD HAVE BEEN REFUSED IN ANY EVENT
The case of Farnham Town Council v Secretary of State for Levelling Up Housing & Communities & Anor [2024] EWHC 2458 (Admin) (Tim Smith, sitting as a High Court Judge) is far from being the first case about service of…
STRIKING OUT AMENDED PLEADINGS, EXTENSIONS OF TIME AND THE ISSUE OF THE “IMPLIED SANCTION”: COURT OF APPEAL DECISION
For some time now the courts have been grappling with the notion of the “implied sanction” in relation to rules and orders. Some rules are subject to “implied sanctions” so that a failure to comply means that a party has…
SERVICE OF THE CLAIM FORM ISSUES: CLAIMANT FAILS TO COMPLY WITH MANDATORY REQUIREMENTS: HIGH COURT UPHOLDS THE EXTENSIONS OF TIME
The judgment of Mrs Justice Hill in Graham v Fidelidade – Companhia De Seguros SA [2024] EWHC 2010 (KB) contains some salutary lessons for litigators. In particular the importance of complying the the rules for applying for extensions of time…
COURT REFUSES TO EXTEND TIME FOR SERVICE OF THE CLAIM FORM: CLAIMANTS COME TO GRIEF
In Playfair & Ors v Pannells LLP & Ors [2024] EWHC 1933 (Ch) Master Brightwell refused the claimants’ application for an extension of time for service of the claim form. The application was made before the time of expiry for…
THERE IS A LEGALLY SIGNIFICANT DIFFERENCE BETWEEN AN APPEAL LODGED OUT OF TIME AND ONE LODGED IN TIME, BUT WITH DOCUMENTS MISSING: COURT OF APPEAL OBSERVATIONS ON EAT RULES
It is rare for this blog to consider anything related to employment law, let alone procedure in the Employment Tribunals. However the Court of Appeal decision in Ridley v HB Kirtley t/a Queen’s Court Business Centre [2024] EWCA Civ 875…
TEACHER’S APPEAL WAS IN TIME AND IN THE RIGHT COURT: NO REQUIREMENT TO APPEAL TO THE ADMINISTRATIVE COURT
In Sutcliffe v Secretary of State for Education [2024] EWHC 1878 (Admin) Mr Justice Pepperall held that a teacher, exercising a statutory right of appeal to the High Court, had appealed in time when filing an appeal in the King’s…
COURT MADE PEREMPTORY ORDER THAT CLAIMANT PAY COSTS: ARTICLE 6 RIGHTS NOT INFRINGED
In Khokan v Nirjhor [2024] EWHC 1872 (KB) Mrs Justice Hill granted the defendant’s application for a peremptory order following the claimant’s failure to pay costs ordered against him at an interlocutory hearing. The judge refused the claimant’s application for…
“CIVIL LITIGATION IN THE MODERN ERA REQUIRES THE PARTIES TO BEHAVE REASONABLY”, PARTY PENALISED IN COSTS FOR NOT AGREEING TO AN EXTENSION OF TIME
In Invenia Technical Computing Corporation & Anor v Hudson [2024] EWHC 1481 (KB) Mr Justice Knowles held that a party that had refused a reasonable request for an extension of time should pay the costs of that application. “……
SECRETARY OF STATE REFUSED PERMISSION TO RELY ON A WITNESS STATEMENT THAT WAS SERVED LATE
In One Trees Estates Ltd, R (On the Application Of) v Secretary of State for the Home Department [2024] EWHC 1644 (Admin) Margaret Obi, sitting as a Deputy High Court Judge, refused the Secretary of State’s application for permission to…
A MORE UNUSUAL “CLAIM FORM” ISSUE: CLAIMANT’S EARLIER UNSUCCESSFUL ATTEMPTS TO ISSUE WERE NOT EFFECTIVE AND ACTION WAS STATUTE BARRED: COURT OF APPEAL DECISION TODAY
In Guo v Kinder & Others [2024] EWCA Civ 762 the Court of Appeal rejected an argument that the claimant’s earlier, unsuccessful, attempts to issue a claim form meant that the later claim form could be backdated. The action was,…
SERVICE OF THE CLAIM FORM – ERRORS AND PROBLEMS 5: SERVING THE PARTICULARS OF CLAIM LATE
This is the fifth time we have looked at the judgment in Occupiers of Samuel Garside House v Bellway Homes Ltd & Anor [2024] EWHC 1579 (KB). This time we look at another “trap for the unwary” – the Particulars of Claim were…
SERVICE OF THE CLAIM FORM – ERRORS AND PROBLEMS 4: NOW IT IS THE DEFENDANTS THAT HAVE MADE MISTAKES: AN IMPROPERLY SERVED CLAIM FORM IS NOT A NULLITY
NB AN APPEAL WAS ALLOWED IN THIS CASE SEE Bellway Homes Ltd v The Occupiers of Samuel Garside House [2025] EWCA Civ 1347 We are continuing with the judgment in Occupiers of Samuel Garside House v Bellway Homes Ltd & Anor [2024]…
SERVICE OF THE CLAIM FORM ERRORS AND PROBLEMS 2: HAVE YOU AGREED AN EXTENSION OF TIME? NO YOU HAVEN’T
NB AN APPEAL WAS ALLOWED IN THIS CASE SEE Bellway Homes Ltd v The Occupiers of Samuel Garside House [2025] EWCA Civ 1347 We are returning to the judgment of Master Dagnall in Occupiers of Samuel Garside House v Bellway Homes…
HOW THE DEFENDANT MANAGED TO MISS TIME FOR APPEALING: THE IMPORTANCE OF APPLYING TO THE ORIGINAL JUDGE, AND AGREEING A DRAFT ORDER PROMPTLY
We are looking again at the judgment of Mr Justice Sweeting in Elbanna v Clark (Re Consequential Matters) [2024] EWHC 1471 (KB). The defendant sought permission to appeal. However by virtue of attempting to appeal to the Court of Appeal, thereby…
WHEN IS IT SENSIBLE TO APPLY TO EXTEND TIME FOR SERVICE OF THE CLAIM FORM? NEVER – JUST NEVER: A CASE TO POINT
Yesterday, in a lecture I was giving about issues relating to service of the claim form, I was asked to address the issue of “when is it sensible to apply for an extension of time for service of the claim…
DEFENDANT’S APPLICATION FOR RELIEF FROM SANCTIONS REFUSED: AN APPLICATION TO DISPUTE JURISDICTION SHOULD BE DONE PROMPTLY
In Ibrahim v AXA Belgium [2024] EWHC 856 (KB) Master Fontaine refused the defendant’s application for an extension of time to dispute the jurisdiction. The defendant should have applied within 14 days of acknowledging service, it took 30. The defendant’s…
LAWYERS MUST LIKE LIVING DANGEROUSLY: APPLICATION MADE THREE MINUTES BEFORE DEADLINE: THE CLAIMANT SCRAPES HOME…
In Lloyds Developments Ltd v Accor HotelServices UK Ltd [2024] EWHC 941 (TCC) Mrs Justice Jefford considered a claimant’s application for an extension of time to comply with a peremptory order which was made 3 minutes prior to the time…
SERVICE OF THE CLAIM FORM: GOOD NEWS FOR THE CLAIMANT (FOR A CHANGE)
NB – THIS DECISION WAS OVERTURNED ON APPEAL – SEE Secretary of State for Levelling Up, Housing and Communities v Rogers [2024] EWCA Civ 1554 In Rogers v Secretary of State for Levelling Up, Housing and Communities & Anor [2023]…
DENTON WATCH 2: COURT REFUSES LATE APPLICATION FOR PERMISSION TO APPEAL
In Tameside Caravans and Storage Ltd v Viavecto Ltd [2024] EWHC 95 (KB) Mr Justice Constable refused the defendant’s request for permission to appeal out of time. The fact that the defendant was a litigant in person at the time…
EXTENSIONS OF TIME TO SERVE THE CLAIM FORM SET ASIDE: YOU CANNOT HOLD ON: CARGO CLAIM COMES TO GRIEF
I clearly called time too early when I wrote, in a post on December 5, that we may the considering last claim form post of the year. We have another example of a claimant coming to grief in Doliaa SAS…
CLAIM FORM SERVED LATE: NO EXTENSION OF TIME GIVEN: PLANNING TO FAIL
In Telford And Wrekin Council v Secretary of State for Levelling Up, Housing and Communities & Anor [2023] EWHC 2439 (Admin) Mr Justice Eyre held that a claim form had been served late. Further the claimant did not come within…
COST BITES 83: DEFENDANT SERVING BUDGET LATE SCRAPES HOME IN A “BORDERLINE” CASE
In K/S Mountain Invest v Ducat Maritime Ltd [2023] EWHC 939 (Comm) HHJ Keyser KC (sitting as a High Court Judge) granted the defendant relief from sanctions following the late filing of its costs budget. The defendant was, perhaps, fortunate….
AGREEING EXTENSIONS OF TIME FOR SERVICE: THE ESSENTIAL POINT THAT THEY MUST BE IN WRITING
An interesting issue about “agreements” is referred to in the judgment of Mr Justice Kerr in Clarion Housing Association Ltd v Crest Nicholson Operations Ltd [2023] EWHC 620 (TCC). I will be looking at the case in more detail later. …
WHY APPLYING FOR AN EXTENSION OF TIME TO SERVE THE CLAIM FORM IS A DANGEROUS BUSINESS: A CASE TODAY AND SOME REMINDERS
The judgment of HHJ Hodge KC in Harrington Scott Ltd v Coupe Bradbury Solicitors Ltd (PROFESSIONAL NEGLIGENCE – Solicitors – Loss of opportunity to pursue claim to trial – Damages – Defendant’s application to strike out and for summary judgment)…
COST BITES 14: TIME FOR PAYMENT OF COURT AWARD THERE SHOULD BE EVIDENCE TO SUPPORT ANY APPLICATION FOR FURTHER TIME
We are returning to the judgment in Vitol SA v Genser Energy Ghana Ltd [2022] EWHC 1955 (Comm) Ms Lesley Anderson QC (sitting as a Deputy High Court Judge). It is quite common for a party ordered to pay costs to…
THE IMPORTANT DIFFERENCE BETWEEN A PROSPECTIVE AND RETROSPECTIVE APPLICATION TO SERVE A CLAIM FORM: “CLEAR WATER” BETWEEN THE TWO TESTS: COURT OF APPEAL OVERTURNS ORDER SETTING ASIDE A PROSPECTIVE APPLICATION FOR SERVICE
In ST v BAI (SA) Trading As Brittany Ferries [2022] EWCA Civ 1037 the Court of Appeal overturned a decision, itself made on appeal, where a prospective application to extend time for service of the claim form was set aside….
PROVING THINGS 234: PROVIDE AN EXPLANATION FOR DELAY BY EVIDENCE – NOT BY SUBMISSIONS
The judgment of Mr Justice Henshaw in Hays & Ors v Bloomfield Investments LLC [2022] EWHC 1648 (Comm) was on a very specific area of procedure. However there is one matter of more general interest. The need to have evidence…
APPLICATION FOR PERMISSION TO APPEAL WAS MADE OUT OF TIME: THE TRIAL JUDGE HAD NO JURISDICTION TO HEAR THE APPLICATION
There is another aspect of the judgment in Omya UK Ltd v Andrews Excavations Ltd & Anor [2022] EWHC 1882 (TCC) that is worth considering. The unsuccessful defendants applied for permission to appeal to the trial judge at the hearing…
CLAIMANT’S APPLICATION FOR AN EXTENSION OF TIME TO SERVE PARTICULAR OF CLAIM REFUSED: A CASE THAT WAS IN THE “LAST CHANCE SALOON” FOR FAR TOO LONG
In CDE v Buckinghamshire County Council [2022] EWHC 738 (QB) Master Thornett rejected a claimant’s application for an extension of time for service of the particulars of claim. The action had a long history with a pattern of delay on…
You must be logged in to post a comment.