WHY DEFENDANTS HAVE TO KNOW THE RULES ABOUT SERVICE AND JURISDICTION AND ACT PROMPTLY: YOU'LL FIND YOURSELVES MAKING AN APPLICATION FOR RELIEF FROM SANCTIONS

WHY DEFENDANTS HAVE TO KNOW THE RULES ABOUT SERVICE AND JURISDICTION AND ACT PROMPTLY: YOU’LL FIND YOURSELVES MAKING AN APPLICATION FOR RELIEF FROM SANCTIONS

June 28, 2019 · by gexall · in Applications, Avoiding negligence claims, Civil Procedure, Extensions of time, Members Content, Relief from sanctions, Service of the claim form

The judgment today in Babcock Marine (Clyde) Ltd v HS Barrier Coatings Ltd [2019] EWHC 1659 (TCC) highlights the need for defendants to be prompt if they are making an application in relation to service or jurisdiction. CPR 11 gives…

EXTENSION OF TIME FOR SERVICE SET ASIDE: THE DANGERS OF SEEKING TO EXTEND THE LIFE OF A CLAIM FORM ON A WITHOUT NOTICE BASIS - EXEMPLIFIED

EXTENSION OF TIME FOR SERVICE SET ASIDE: THE DANGERS OF SEEKING TO EXTEND THE LIFE OF A CLAIM FORM ON A WITHOUT NOTICE BASIS – EXEMPLIFIED

June 28, 2019 · by gexall · in Appeals, Applications, Avoiding negligence claims, Extensions of time, Members Content, Service of the claim form, Serving documents

In Al-Zahra (PVT) Hospital & Ors v DDM [2019] EWCA Civ 1103 the Court of Appeal allowed an appeal by defendants who objected to an extension of time being granted for service of the claim form.  It is an object…

MAKING APPLICATIONS IN ADVANCE OF A BREACH: WHY A STITCH IN TIME OFTEN, BUT NOT INVARIABLY, SAVES AN APPLICANT

MAKING APPLICATIONS IN ADVANCE OF A BREACH: WHY A STITCH IN TIME OFTEN, BUT NOT INVARIABLY, SAVES AN APPLICANT

June 25, 2019 · by gexall · in Applications, Civil Procedure, Extensions of time, Members Content, Relief from sanctions

The post earlier today about the decision in Bedzhamov & Ors Re Vneshprombank LLC [2019] EWHC 1430 (Ch) was an example of the court refusing an application for an extension of time made in advance of the date of breach. The…

APPLICATION FOR EXTENSION MADE AHEAD OF TIME REFUSED: AN UNREASONABLE SECOND BITE OF THE CHERRY

APPLICATION FOR EXTENSION MADE AHEAD OF TIME REFUSED: AN UNREASONABLE SECOND BITE OF THE CHERRY

June 25, 2019 · by gexall · in Applications, Extensions of time, Members Content

In Bedzhamov & Ors Re Vneshprombank LLC [2019] EWHC 1430 (Ch) Mrs Justice Falk refused an application for an extension of time that had been made ahead of the date of compliance. In these circumstances the courts will normally grant…

ATTEMPTING TO OBTAIN EXTENSIONS OF TIME BY INFORMAL EMAIL : THE COURT TAKES A "SINGULARLY DIM VIEW" OF ATTEMPTS BY PARTIES TO CIRCUMVENT THE RULES (OH, AND BUNDLES AGAIN)

ATTEMPTING TO OBTAIN EXTENSIONS OF TIME BY INFORMAL EMAIL : THE COURT TAKES A “SINGULARLY DIM VIEW” OF ATTEMPTS BY PARTIES TO CIRCUMVENT THE RULES (OH, AND BUNDLES AGAIN)

June 10, 2019 · by gexall · in Abuse of Process, Access to justice, Appeals, Applications, Bundles, Case Management, Conduct, Extensions of time, Members Content

In Saint Benedict Land Trust Ltd v London Borough of Camden & Anor [2019] EWHC 1433 (Ch) (17 May 2019) Mr Justice Marcus Smith took a very dim view indeed of an attempt by a litigant to obtain an extension…

TRYING TO SERVE A SUPPLEMENTAL EXPERT'S REPORT: WHEN DO THE DENTON PRINCIPLES APPLY?

TRYING TO SERVE A SUPPLEMENTAL EXPERT’S REPORT: WHEN DO THE DENTON PRINCIPLES APPLY?

May 21, 2019 · by gexall · in Applications, Expert evidence, Experts, Extensions of time, Members Content, Relief from sanctions

In Global Horizons Corporation -v- Gray [2019] EWHC 1132 (Ch) Mr Justice Arnold considered the question of when the Denton principles apply to service of a “supplementary” medical report.   “… the question of whether an application for permission to…

CIVIL PROCEDURE BACK TO BASICS 42: WHY A DAY EARLY IS SO VERY DIFFERENT TO A DAY LATE: THE ROBERT CRITERIA

CIVIL PROCEDURE BACK TO BASICS 42: WHY A DAY EARLY IS SO VERY DIFFERENT TO A DAY LATE: THE ROBERT CRITERIA

May 9, 2019 · by gexall · in Applications, Avoiding negligence claims, Civil Procedure, Extensions of time, Members Content, Relief from sanctions

There is a world of different between a prospective and retrospective application to extend time, or comply with an order.   Every litigator has to know about Robert -v- Momentum Services [2003] EWCA Civ 229.  An application made in advance means that the…

RELIEF FROM SANCTIONS, LATE SERVICE OF NOTICE TO APPEAL AND THE LITIGANT IN PERSON

RELIEF FROM SANCTIONS, LATE SERVICE OF NOTICE TO APPEAL AND THE LITIGANT IN PERSON

March 27, 2019 · by gexall · in Appeals, Applications, Extensions of time, Litigants in person, Members Content, Relief from sanctions

In  London Borough of Hamlets v Al Ahmed [2019] EWHC 749 (QB) Mr Justice Dove set aside an order granting an appellant an extension of time for appealing.  The fact that the appellant was a litigant in person was not a…

AGREEING EXTENSIONS OF TIME: ADVICE FROM M' LEARNED FRIEND: "DON'T PANIC" AND BE TOTALLY CLEAR IN WHAT YOU ARE AGREEING

AGREEING EXTENSIONS OF TIME: ADVICE FROM M’ LEARNED FRIEND: “DON’T PANIC” AND BE TOTALLY CLEAR IN WHAT YOU ARE AGREEING

March 16, 2019 · by gexall · in Civil Procedure, Extensions of time, Limitation, Members Content

In his post yesterday Agreeing An Extension to the Limitation Period Nigel Poole QC dealt with some of the issues arising from the judgment in  Cowan v Foreman and ors [2019] EWHC 349 (Fam) where Mostyn J suggested it was not possible for the…

LIMITATION AND INHERITANCE ACT CLAIMS: SOMETHING TO WATCH CAREFULLY: AGREEING "LIMITATION AMNESTY" MAY NOT BE POSSIBLE

LIMITATION AND INHERITANCE ACT CLAIMS: SOMETHING TO WATCH CAREFULLY: AGREEING “LIMITATION AMNESTY” MAY NOT BE POSSIBLE

March 4, 2019 · by gexall · in Applications, Avoiding negligence claims, Civil Procedure, Extensions of time, Limitation, Members Content

NB – THESE COMMENTS ON THE POWER TO AGREE AN AMNESTY WERE DOUBTED BY THE COURT OF APPEAL SEE THE POST HERE   In Cowan v Foreman & Ors [2019] EWHC 349 (Fam) Mr Justice Mostyn set out some importance principles in…

CIVIL PROCEDURE BACK TO BASICS 30: THE ADVANTAGES OF APPLYING FOR AN EXTENSION BEFORE THE DATE OF BREACH: THE CASE KEEPS MOMENTUM

CIVIL PROCEDURE BACK TO BASICS 30: THE ADVANTAGES OF APPLYING FOR AN EXTENSION BEFORE THE DATE OF BREACH: THE CASE KEEPS MOMENTUM

February 7, 2019 · by gexall · in Applications, Extensions of time, Members Content, Relief from sanctions

In Robert –v- Momentum Services Limited [2003] EWCA Civ 299 the Court of Appeal held that where an application for an extension of time is made before the expiry of the stipulated period this was not a case as one of relief from sanctions. The…

TIME FOR APPEALING: ANOTHER TRICKY POINT TO WATCH: TIME RUNS FROM THE DATE OF THE DECISION AND NOT ANY LATER DATE: A HELPFUL GUIDE TO THE PROCEDURE TO BE FOLLOWED

TIME FOR APPEALING: ANOTHER TRICKY POINT TO WATCH: TIME RUNS FROM THE DATE OF THE DECISION AND NOT ANY LATER DATE: A HELPFUL GUIDE TO THE PROCEDURE TO BE FOLLOWED

January 16, 2019 · by gexall · in Appeals, Applications, Extensions of time, Members Content, Relief from sanctions

In McDonald v Rose & Ors [2019] EWCA Civ 4 the Court of Appeal highlighted an important point in relation to the time for appealing.  Time for appealing runs from the date that the decision is given, not a later date….

THE DEFENDANT'S "WRONG" APPLICATION TO DISPUTE JURISDICTION WAS STILL VALID: DEFENDANT ALLOWED EXTENSION OF TIME AND TO CORRECT APPLICATION

THE DEFENDANT’S “WRONG” APPLICATION TO DISPUTE JURISDICTION WAS STILL VALID: DEFENDANT ALLOWED EXTENSION OF TIME AND TO CORRECT APPLICATION

January 15, 2019 · by gexall · in Appeals, Applications, Civil Procedure, Extensions of time, Members Content, Service of the claim form, Serving documents

Twelve years ago, in  Hoddinott and others v Persimmon Homes (Wessex) Limited [2007] EWCA Civ 1203; [2008] 1 WLR 806, the Court of Appeal held that the correct way for a defendant to challenge the validity of a claim form was to issue…

CLAIMANT CANNOT ENTER JUDGMENT AFTER ACKNOWLEDGEMENT OF SERVICE IS FILED LATE: DENTON PRINCIPLES APPLIED TO GRANT DEFENDANT EXTENSION OF TIME TO DISPUTE THE JURISDICTION

CLAIMANT CANNOT ENTER JUDGMENT AFTER ACKNOWLEDGEMENT OF SERVICE IS FILED LATE: DENTON PRINCIPLES APPLIED TO GRANT DEFENDANT EXTENSION OF TIME TO DISPUTE THE JURISDICTION

December 9, 2018 · by gexall · in Applications, Default judgment,, Extensions of time, Members Content, Relief from sanctions, Service of the claim form, Serving documents, Setting aside judgment

The judgment in Cunico Resources NV & Ors v Daskalakis & Anor [2018] EWHC 3382 (Comm) addresses several procedural issues. Firstly the much debated question of whether a claimant can obtain judgment when the defendant has acknowledged service late.  Mr Justice…

LATE SERVICE OF THE PARTICULARS OF CLAIM AND ACCOMPANYING DOCUMENTATION: IT MAY STILL BE DANGEROUS - AND HERE'S WHY

LATE SERVICE OF THE PARTICULARS OF CLAIM AND ACCOMPANYING DOCUMENTATION: IT MAY STILL BE DANGEROUS – AND HERE’S WHY

November 30, 2018 · by gexall · in Avoiding negligence claims, Civil Procedure, Extensions of time, Members Content, Relief from sanctions

We have looked twice already at the judgment in Mark v Universal Coatings & Services Ltd & Anor [2018] EWHC 3206 (QB). One of the key findings in that case was that the claimant, who had served the particulars of claim, medical…

NEW WITNESS STATEMENTS AND EXPERT EVIDENCE NOT ALLOWED: DENTON APPLIED TO CASE MANAGEMENT: COMPLIANCE WITH DIRECTIONS IS THE ONLY SAFE OPTION

NEW WITNESS STATEMENTS AND EXPERT EVIDENCE NOT ALLOWED: DENTON APPLIED TO CASE MANAGEMENT: COMPLIANCE WITH DIRECTIONS IS THE ONLY SAFE OPTION

October 21, 2018 · by gexall · in Applications, Case Management, Civil evidence, Civil Procedure, Expert evidence, Extensions of time, Members Content, Relief from sanctions, Witness statements

In SJ Moore (Jeweller) Limited -v- Squibb Group Limited [2018] EWHC 2731 (QB) Denton principles were considered and applied when the defendant wanted to adduce new evidence.  What is notable  here is the fact that the defendant had the expert…

RELIEF FROM SANCTIONS REQUIRED WHEN RESPONDENT'S NOTICE SERVED LATE: DENTON CONSIDERED

RELIEF FROM SANCTIONS REQUIRED WHEN RESPONDENT’S NOTICE SERVED LATE: DENTON CONSIDERED

October 1, 2018 · by gexall · in Appeals, Applications, Extensions of time, Members Content, Relief from sanctions

In Livewest Homes Ltd v Bamber [2018] EWHC 2454 (QB) Mr Justice Dingemans considered the issue of relief from sanctions when a Respondent’s Notice was served late. It is a useful reminder of the importance of serving a respondent’s notice and…

DENTON PRINCIPLES MEANS THAT APPEAL BITES THE DUST: CONFUSION AND BEING "LOST IN THE FOREST" ARE NOT GOOD GROUNDS FOR AN EXTENSION OF TIME

DENTON PRINCIPLES MEANS THAT APPEAL BITES THE DUST: CONFUSION AND BEING “LOST IN THE FOREST” ARE NOT GOOD GROUNDS FOR AN EXTENSION OF TIME

September 11, 2018 · by gexall · in Appeals, Applications, Extensions of time, Members Content, Relief from sanctions

The Denton principles are considered in detail in the judgment of Edward Murray (sitting as a High Court Judge) in Sabesan v London Borough of Waltham Forest [2018] EWHC 2373 (Admin).   The judgment confirms that the Denton principles are applicable to…

APPLYING FOR AN EXTENSION OF TIME FOR FILING A DEFENCE - AFTER THE DEFENCE IS DUE: DENTON PRINCIPLES APPLIED: FULL TRANSCRIPT NOW AVAILABLE

APPLYING FOR AN EXTENSION OF TIME FOR FILING A DEFENCE – AFTER THE DEFENCE IS DUE: DENTON PRINCIPLES APPLIED: FULL TRANSCRIPT NOW AVAILABLE

September 6, 2018 · by gexall · in Applications, Conduct, Default judgment,, Extensions of time, Members Content, Relief from sanctions

The judgment of Deputy Master Pickering in Billington v Davies & Anor [2016] EWHC 1919 (Ch) has only recently appeared on BAILLI. It raises an interesting issue of how the courts should approach the question of a late application to extend…

DON'T DELAY SERVICE OF THE CLAIM FORM JUST BECAUSE YOU DON'T HAVE THE PARTICULARS OF CLAIM: A NAIL IN THE COFFIN FOR CLAIMANTS WHO DECIDE TO WAIT

DON’T DELAY SERVICE OF THE CLAIM FORM JUST BECAUSE YOU DON’T HAVE THE PARTICULARS OF CLAIM: A NAIL IN THE COFFIN FOR CLAIMANTS WHO DECIDE TO WAIT

August 21, 2018 · by gexall · in Appeals, Applications, Civil Procedure, Extensions of time, Members Content, Service of the claim form

There is another aspect of the judgment in Phoenix Healthcare Distribution Ltd v Woodward & Anor [2018] EWHC 2152 (Ch) that needs highlighting. The lesson here is clear:  you cannot delay service of the claim form on the grounds that you…

"CHANGE IN THE LAW" JUSTIFIES EXTENSION OF TIME: DENTON CONSIDERED IN THE COURT OF APPEAL

“CHANGE IN THE LAW” JUSTIFIES EXTENSION OF TIME: DENTON CONSIDERED IN THE COURT OF APPEAL

July 4, 2018 · by gexall · in Appeals, Applications, Extensions of time, Members Content, Relief from sanctions

The Denton principles were considered by the Court of Appeal in QR (Pakistan), R (on the application of) v The Secretary of State for the Home Department [2018] EWCA Civ 1413.   The fact that a subsequent judgment of the Supreme…

HOME SECRETARY REFUSED PERMISSION TO SERVE EVIDENCE LATE: THE OVERRIDING OBJECTIVE WAS USED EVEN IF DENTON DID NOT APPLY

HOME SECRETARY REFUSED PERMISSION TO SERVE EVIDENCE LATE: THE OVERRIDING OBJECTIVE WAS USED EVEN IF DENTON DID NOT APPLY

June 28, 2018 · by gexall · in Applications, Extensions of time, Members Content, Relief from sanctions, Witness statements

In Teh v Secretary of State for the Home Department [2018] EWHC 1586 (Admin) the Secretary of State was refused permission to rely on evidence served late.  The issue was decided under the Overriding Objective, rather than by reference to the…

THE IMPORTANCE DIFFERENCE BETWEEN PROSPECTIVE AND RETROSPECTIVE APPLICATIONS TO EXTEND TIME: THE IMPORTANCE OF THE DATE OF THE APPLICATION

THE IMPORTANCE DIFFERENCE BETWEEN PROSPECTIVE AND RETROSPECTIVE APPLICATIONS TO EXTEND TIME: THE IMPORTANCE OF THE DATE OF THE APPLICATION

May 29, 2018 · by gexall · in Applications, Extensions of time, Members Content, Relief from sanctions

This post is caused by a search term that arrived on this blog today “Is an application for an extension of time an application for relief from sanctions?”. The short answer to that is – it depends.  An application made after…

CIVIL PROCEDURE - BACK TO BASICS 1: THE HUMBLE APPLICATION: WORDING AND TIMING

CIVIL PROCEDURE – BACK TO BASICS 1: THE HUMBLE APPLICATION: WORDING AND TIMING

April 5, 2018 · by gexall · in Applications, Civil Procedure, Extensions of time, Members Content

Last year I was giving an in-house talk at a very prominent firm of litigation solicitors.  The litigation partner present (a person of immense experience) made the point that the firm were continually having talks and education on esoteric and…

MISTAKES, APPEALS, DENTON AND LITIGANTS IN PERSON: "JUDGES DIFFER, ONE FROM ANOTHER, IN SMALL, HUMAN, WAYS"

MISTAKES, APPEALS, DENTON AND LITIGANTS IN PERSON: “JUDGES DIFFER, ONE FROM ANOTHER, IN SMALL, HUMAN, WAYS”

March 29, 2018 · by gexall · in Appeals, Applications, Extensions of time, Litigants in person, Members Content

In EDF Energy Customers Ltd v Re-Energized Ltd [2018] EWHC 652 (Ch)  HHJ Paul Matthews (sitting as a High Court Judge) carried out a comprehensive review of the authorities relating to the latitude to be afforded to litigants in person. It…

COURT OF APPEAL UPHOLDS REFUSAL OF EXTENSION OF TIME IN FOREIGN JUDGMENTS CASE: JUDGMENT TODAY

COURT OF APPEAL UPHOLDS REFUSAL OF EXTENSION OF TIME IN FOREIGN JUDGMENTS CASE: JUDGMENT TODAY

March 9, 2018 · by gexall · in Appeals, Applications, Extensions of time, Members Content, Relief from sanctions

A post in 2015 looked at the decision in In Christofi -v- National Bank of Greece (Cyprus) Ltd [2015] EWHC 986 (QB) Mrs Justice Andrews DBE held that there were very limited grounds for extending time in an appeal against the registration of…

SIR RUPERT JACKSON ON THE DAY OF HIS RETIREMENT: A REVIEW OF SOME JUDGMENTS ON PROCEDURE

SIR RUPERT JACKSON ON THE DAY OF HIS RETIREMENT: A REVIEW OF SOME JUDGMENTS ON PROCEDURE

March 6, 2018 · by gexall · in Access to justice, Appeals, Bundles, Case Management, Civil evidence, Civil Procedure, Conduct, Extensions of time, Members Content, Relief from sanctions, Witness statements, Written advocacy

It is well known that Sir Rupert Jackson retires on the 7th March.  There are several reviews of the work Sir Rupert has done in re-shaping civil procedure.  Here I want to look at a few of his judgments that…

EXTENSIONS OF TIME FOR SERVICE WERE PROPERLY GRANTED: APPLICATIONS TO SET ASIDE ARE A REHEARING NOT A REVIEW: HIGH COURT DECISION

EXTENSIONS OF TIME FOR SERVICE WERE PROPERLY GRANTED: APPLICATIONS TO SET ASIDE ARE A REHEARING NOT A REVIEW: HIGH COURT DECISION

February 27, 2018 · by gexall · in Appeals, Extensions of time, Members Content, Service of the claim form

Another week, another case about service of the claim form. This time the claimant was more successful. In DDM v Al-Zahra (PVT) Hospital & Ors [2018] EWHC 346 (QB). Mr Justice Foskett allowed an appeal against a Master’s decision setting aside…

DENTON APPLIED TO LATE APPEAL: SUBMITTING SUBMISSIONS AFTER A HEARING AND THE NEED FOR CAUTION WHEN SEEKING DAMAGES UNDER THE HUMAN RIGHTS ACT

DENTON APPLIED TO LATE APPEAL: SUBMITTING SUBMISSIONS AFTER A HEARING AND THE NEED FOR CAUTION WHEN SEEKING DAMAGES UNDER THE HUMAN RIGHTS ACT

February 2, 2018 · by gexall · in Appeals, Applications, Damages, Extensions of time, Members Content, Relief from sanctions

In Fayad, R (On the Application Of) v The Secretary of State for the Home Department [2018] EWCA Civ 54 the Court of Appeal applied the Denton principles to a late appeal.  Permission to appeal was refused. Mr Justice Singh had…

THE PERILOUS STRATEGY OF SERVING  EVIDENCE  LATE: DENTON APPLIES:  A RELEVANT FACTOR IN A SUMMARY JUDGMENT APPLICATION

THE PERILOUS STRATEGY OF SERVING EVIDENCE LATE: DENTON APPLIES: A RELEVANT FACTOR IN A SUMMARY JUDGMENT APPLICATION

January 28, 2018 · by gexall · in Applications, Extensions of time, Members Content, Relief from sanctions, Sanctions, Summary judgment, Witness statements

The case of  Crown House Technologies Ltd v Cardiff Commissioning Ltd & Anor [2018] EWHC 54 (TCC) highlights the dangers of waiting to serve evidence until the last moment. If it is served late then a party requires permission of the…

COURT ORDER ALLOWING PROSPECTIVE AND RETROSPECTIVE EXTENSIONS OF TIME: A BRIEF EXAMPLE

COURT ORDER ALLOWING PROSPECTIVE AND RETROSPECTIVE EXTENSIONS OF TIME: A BRIEF EXAMPLE

January 25, 2018 · by gexall · in Applications, Case Management, Civil Procedure, Extensions of time, Members Content

I am grateful to Dominic Regan for providing a precedent that allows the parties to extend time for compliance prospectively and retrospectively. THE ISSUE During a discussion on Twitter Dominic mentioned that some courts were habitually making orders that allowed…

PERMISSION TO APPEAL - TWO YEARS OUT OF TIME - SET ASIDE: COURT WAS "MISLED BY SERIOUS MISREPRESENTATIONS AND NON DISCLOSURES"

PERMISSION TO APPEAL – TWO YEARS OUT OF TIME – SET ASIDE: COURT WAS “MISLED BY SERIOUS MISREPRESENTATIONS AND NON DISCLOSURES”

October 11, 2017 · by gexall · in Appeals, Applications, Extensions of time, Members Content

In Kovarska v Otkritie International Investment Management Ltd & Ors [2017] EWCA Civ 1485 the Court of Appeal set aside an extension of time for appealing.  The order had been granted without a hearing. It was held that the Court…

LATE SERVICE OF THE PARTICULARS OF CLAIM: RELIEF FROM SANCTIONS REFUSED: DETAILS OF CLAIM DO NOT CONSTITUTE PARTICULARS OF CLAIM

LATE SERVICE OF THE PARTICULARS OF CLAIM: RELIEF FROM SANCTIONS REFUSED: DETAILS OF CLAIM DO NOT CONSTITUTE PARTICULARS OF CLAIM

October 2, 2017 · by gexall · in Case Management, Extensions of time, Members Content, Relief from sanctions, Serving documents

In Chelsea Bridge Apartments Ltd -v- Old Street Homes Ltd (Deputy Master Cousins, 4th September 2017*) Deputy Master Cousins refused the claimants’ application for relief from sanctions in failing to serve Particulars of claim on time. “I find that the…

SERVICE OF PROCEEDINGS WITHOUT PERMISSION: THE COURT HAS POWER TO RECTIFY THE POSITION RETROSPECTIVELY

SERVICE OF PROCEEDINGS WITHOUT PERMISSION: THE COURT HAS POWER TO RECTIFY THE POSITION RETROSPECTIVELY

September 6, 2017 · by gexall · in Applications, Extensions of time, Members Content, Service of the claim form, Serving documents

Can the court rectify the situation when a claimant, who requires permission to continue proceedings, has issued and served without such permission? That was the question considered by His Honour Judge Davis-White QC in Wilton UK Ltd v Shuttleworth & Ors…

BLUEBELLS, THE MASTERS' CORRIDOR AND  THE CLAIM FORM:  "A DRY AND UNLOVELY CROP OF PROCEDURAL SERVICE ISSUES"

BLUEBELLS, THE MASTERS’ CORRIDOR AND THE CLAIM FORM: “A DRY AND UNLOVELY CROP OF PROCEDURAL SERVICE ISSUES”

August 12, 2017 · by gexall · in Extensions of time, Members Content, Service of the claim form, Serving documents

There are numerous cases about service of the claim form on this blog. They are clearly a major issue in the Masters’ Corridor. Witness the opening words of Master McCloud’s judgment in Caretech Community Services Ltd v Oakden & Ors [2017]…

WHY LIFE IS NOW  DANGEROUS FOR DEFENDANTS (ESPECIALLY THOSE WHO DON'T FILE A DEFENCE ON TIME)

WHY LIFE IS NOW DANGEROUS FOR DEFENDANTS (ESPECIALLY THOSE WHO DON’T FILE A DEFENCE ON TIME)

July 21, 2017 · by gexall · in Applications, Default judgment,, Extensions of time, Members Content, Relief from sanctions, Summary judgment

The judgment of Mr Justice Coulson in ADVA Optical Networking Limited -v- Optron Holding Limited  [2017] EWHC 1813 (TCC) highlights what a dangerous world this can be for defendants. A defendant who is late filing a defence, and where judgment has not been…

AGREEING EXTENSIONS OF TIME: REFUSAL TO AGREE CONTRARY TO THE OVERRIDING OBJECTIVE HAS CONSEQUENCES IN COSTS

AGREEING EXTENSIONS OF TIME: REFUSAL TO AGREE CONTRARY TO THE OVERRIDING OBJECTIVE HAS CONSEQUENCES IN COSTS

June 5, 2017 · by gexall · in Applications, Costs, Extensions of time, Members Content

When should a party agree an extension of time? In Emmanuel -v- The Commissioners for Her Majesty’s Revenue and Customs [2017]  EWHC 1253 (Ch)  Her Honour Judge Karen Walden Smith made some telling observations . “… in my judgment the…

DELAY, DENTON, APPEALS AND CROSS-APPEALS: EXTENSION OF TIME WOULD HAVE BEEN GRANTED

DELAY, DENTON, APPEALS AND CROSS-APPEALS: EXTENSION OF TIME WOULD HAVE BEEN GRANTED

April 13, 2017 · by gexall · in Appeals, Extensions of time, Members Content, Relief from sanctions

In Pinisetty -v-Manikonda [2017] EWHC 838 (QB) Mr Justice Langstaff considered an issue relating to an appeal (and cross-appeal)  being out of time. Although the judgment on this issue is largely academic (the appeal failed in any event), it contains…

RELIEF FROM SANCTIONS GRANTED AFTER SECRETARY OF STATE RELIED UPON AN OUTDATED REFERENCE IN THE WHITE BOOK

RELIEF FROM SANCTIONS GRANTED AFTER SECRETARY OF STATE RELIED UPON AN OUTDATED REFERENCE IN THE WHITE BOOK

March 26, 2017 · by gexall · in Appeals, Extensions of time, Members Content, Relief from sanctions

In AM (Pakistan) -v- Secretary of State for the Home Department [2017] EWCA Civ 180 the Court of Appeal granted relief after an appeal was filed late.  The appellant had relied upon an out of date commentary in the white…

THE DUTY OF FULL DISCLOSURE ON WITHOUT NOTICE APPLICATIONS: ANOTHER EXAMPLE OF PROBLEMS OCCURRING

February 3, 2017 · by gexall · in Applications, Extensions of time, Members Content, Service of the claim form

The New Year’s resolution for litigators that I recommended this year came (apparently) as a surprise to many: “Think very carefully before, during and after, making an ex parte application of any kind.”  The judgment of Mrs Justice Andrews DBE…

LIMITATION, EXTENSIONS AND THE HUMAN RIGHTS ACT: COURT OF APPEAL SAYS NO

January 26, 2017 · by gexall · in Appeals, Extensions of time, Limitation, Members Content

For the second time within a week we have a case where the courts consider the discretion to extend time under s.7(5)(a) of the Human Rights Act 1998.  In London Borough of Hackney -v- Williams [2017] EWCA Civ 26 the…

DELAY AND NON-COMPLIANCE: ACTION STRUCK OUT: A "GAME CHANGER"

January 4, 2017 · by gexall · in Applications, Damages, Extensions of time, Members Content, Relief from sanctions, Striking out, Uncategorized

The judgment of Master Matthew in Phelps -v- Button [2016] EWHC 3185 (Ch) emphasises the dangers of delay and non compliance. “…I will observe that the Court ethos has changed enormously since the days of Lord Denning and the two…

MINISTRY OF DEFENCE REFUSED EXTENSION OF TIME TO COMPLY WITH PEREMPTORY ORDER: ORDERS ARE ORDERS

November 24, 2016 · by gexall · in Applications, Disclosure, Extensions of time, Members Content, Relief from sanctions, Uncategorized

In Eaglesham -v- Ministry of Defence [2016] EWHC 3011 (QB) Mrs Justice Andrews DBE refused the defendant’s application for an extension of time for compliance with an unless order. The Defence was struck out. “A party who faces genuine difficulties…

WITNESS CREDIBILITY, DELAY AND DENTON.

November 2, 2016 · by gexall · in Applications, Extensions of time, Members Content, Relief from sanctions, Uncategorized, Witness statements

There is an interesting discussion of  the credibility  of witnesses in the judgment of Mr Registrar Briggs in Preston -v- Green (Liquidator of Cre8atsea Limited) [2016] EWHC 25222 (Ch). The Registrar also had to consider whether to exercise his discretion…

IF THE DEFENCE IS FILED LATE THE CLAIMANT IS STILL ENTITLED TO DEFAULT JUDGMENT: TWO POINTS TO WATCH

September 8, 2016 · by gexall · in Applications, Default judgment,, Extensions of time, Members Content, Relief from sanctions, Setting aside judgment, Uncategorized

NB THIS DECISION HAS SINCE BEEN OVERTURNED BY A CHANGE IN THE RULES, SEE THE POST HERE. The decision of Deputy Master Pickering in Billington -v- Davies [2016] EWHC 1919 (Ch) illustrates two important principles that are often overlooked. A…

PEREMPTORY ORDERS, EXTENSIONS OF TIME AND WITNESS CREDIBILITY

May 16, 2016 · by gexall · in Applications, Extensions of time, Members Content, Peremptory orders, Relief from sanctions, Uncategorized

In Suez Fortune Investments Ltd -v- Talbot Underwriting Ltd [2016]  EWHC 1085 (Comm) Mr Justice Flaux considered an application to extend time or vary a peremptory order. “I consider that a claimant in contumelious breach of Court Orders whose claim…

EXTENDING TIME FOR SERVICE OF A CLAIM FORM: PROSECCO MAY HELP

May 12, 2016 · by gexall · in Appeals, Extensions of time, Insolvency, Members Content, Service of the claim form, Uncategorized

There have been numerous cases relating to extension of the claim form on this blog. I can’t remember one which ended well for the claimant.  However the claimant was successful in the Instone -v- Prosecco (Leeds) LImited [2016] EW Misc…

LATE SERVICE OF NOTICE OF APPEAL: COUNSEL'S ERROR DOES NOT AMOUNT TO A GOOD REASON

May 5, 2016 · by gexall · in Appeals, Applications, Extensions of time, Members Content, Relief from sanctions, Uncategorized

In the judgment today in Turner -v- South Cambridgeshire District Council [2016] EWHC 1017(Admin)Mr Justice Warby considered the Denton guidance in relation to an application to appeal out of time. Among other factors he rejected the idea that an error…

"IN TIME" APPLICATION TO EXTEND TIME FOR PEREMPTORY ORDER REFUSED: CLAIM STRUCK OUT

April 15, 2016 · by gexall · in Applications, Civil Procedure, Extensions of time, Members Content, Peremptory orders, Relief from sanctions, Uncategorized

I am grateful to Charles Bagot of Hardwicke Chambers for bringing my attention to the decision in Kranniqi -v- Watford Timber Company Ltd (District Judge Parfitt 13/04/2016). It is a working example of (i)the dangers of failing to comply with…

DENTON DOES NOT APPLY TO DELAY IN PROVISIONAL ASSESSMENT

March 5, 2016 · by gexall · in Applications, Assessment of Costs, Case Management, Costs, Extensions of time, Members Content, Relief from sanctions, Uncategorized

I am grateful to Simon Anderson of Park Square Barristers for his note of the judgment of Deputy District Judge Hill yesterday (4th March 2016) in the case of Martin -v- The Leeds Teaching Hospitals NHS Trust. This decision is…

← Previous 1 2 3 4 Next →

Subscribe to Blog via Email

Enter your email address to subscribe to this blog and receive notifications of new posts by email. Subscription notifies you of a new post, it does not give you access to members' content.

Join 35.2K other subscribers

Recent Posts

  • EXPERT WATCH 16: IS PART 35 PERMISSION NEEDED WHEN A DOCTOR GIVES OPINION EVIDENCE AS TO A PARTY’S ABILITY TO PARTICIPATE IN LITIGATION?
  • WITNESS EVIDENCE WEDNESDAY: HOW NUMEROUS SMALL REPETITIONS, AND UNEVIDENCED CLAIMS FOR DAMAGES UNDERMINE THE CREDIBILITY OF THE CASE
  • MAZUR MATTERS 3: CILEX MEMBERS – THE REAL VICTIMS OF ALL THIS: WHAT CILEX MEMBERS CAN DO ABOUT THIS
  • COST BITES 294: “A DETAILED ASSESSMENT IS NOT THE FORUM TO RESCUE OR TO ATTEMPT TO CHANGE THE EFFECT OF A POORLY WORDED ORDER”: THE COURT WOULD NOT CONSIDER ASSERTIONS OF POTENTIAL FUNDAMENTAL DISHONESTYOF THE PRIMARY ACTION ON ASSESSMENT
  • COST BITES 293: AN EXAMPLE OF AN ASSESSMENT OF A SUMMARY ASSESSMENT (AND COSTS BEING REDUCED) WHEN THE OPPOSING PARTY WAS NOT PRESENT

Top Posts

  • MAZUR MATTERS 3: CILEX MEMBERS - THE REAL VICTIMS OF ALL THIS: WHAT CILEX MEMBERS CAN DO ABOUT THIS
  • MAZUR MATTERS 2: THE ROLE OF THE SOLICITORS REGULATORY AUTHORITY : THE REGULATOR THAT GOT THE LAW WRONG AND IS NOW "PONDERING" WHAT TO DO...
  • MAZUR MATTERS 1: THE PENALTIES FOR NON-QUALIFIED STAFF CONDUCTING LITIGATION (AKA "HOW MUCH TIME COULD I SERVE")
  • COST BITES 293: AN EXAMPLE OF AN ASSESSMENT OF A SUMMARY ASSESSMENT (AND COSTS BEING REDUCED) WHEN THE OPPOSING PARTY WAS NOT PRESENT
  • THE PRACTICAL IMPLICATIONS OF MAZUR CONSIDERED: HOW NOT TO BREAK THE CRIMINAL LAW BY USING NON-QUALIFIED STAFF... WEBINAR 3rd OCTOBER 2025

Archives

Blogroll

  • Coronavirus: Guidance for lawyers and businesses
  • Fatal Accident Law
  • Personal injury: Liability and Damages

Books

  • Munkman & Exall on Damages for Personal Injuries and Death 15th ed
  • The APIL Guide to Fatal Accidents 4th edition

Useful Links

  • Buntools (for preparing PDF Bundles)
  • Kings Chambers
  • Kings Chambers Costs & Litigation Funding
  • Kings Chambers Serious Injury
  • The Civil Procedure Rules
  • The National Archives Recently Published Judgments
  • The Senior Court Costs Office Guide 2023
  • Website of 4 – 5 Gray's Inn Square
  • www.Bailii.org

Copyright

© Gordon Exall, Exall Legal Training, Civil Litigation Brief, 2013-2025. Unauthorised use and or duplication of the material contained on this blog without permission is strictly prohibited.
Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.
To find out more, including how to control cookies, see here: Cookie Policy
  • Membership Terms and Conditions
  • Privacy Policy
  • Advertising Policy
  • Copyright
  • Legal Disclaimer

Copyright © 2025 Civil Litigation Brief

Powered by Big Yellow Workshop

 

Loading Comments...
 

You must be logged in to post a comment.