APPLICATION FOR EXTENSION MADE AHEAD OF TIME REFUSED: AN UNREASONABLE SECOND BITE OF THE CHERRY

APPLICATION FOR EXTENSION MADE AHEAD OF TIME REFUSED: AN UNREASONABLE SECOND BITE OF THE CHERRY

June 25, 2019 · by gexall · in Applications, Extensions of time, Members Content

In Bedzhamov & Ors Re Vneshprombank LLC [2019] EWHC 1430 (Ch) Mrs Justice Falk refused an application for an extension of time that had been made ahead of the date of compliance. In these circumstances the courts will normally grant…

ATTEMPTING TO OBTAIN EXTENSIONS OF TIME BY INFORMAL EMAIL : THE COURT TAKES A "SINGULARLY DIM VIEW" OF ATTEMPTS BY PARTIES TO CIRCUMVENT THE RULES (OH, AND BUNDLES AGAIN)

ATTEMPTING TO OBTAIN EXTENSIONS OF TIME BY INFORMAL EMAIL : THE COURT TAKES A “SINGULARLY DIM VIEW” OF ATTEMPTS BY PARTIES TO CIRCUMVENT THE RULES (OH, AND BUNDLES AGAIN)

June 10, 2019 · by gexall · in Abuse of Process, Access to justice, Appeals, Applications, Bundles, Case Management, Conduct, Extensions of time, Members Content

In Saint Benedict Land Trust Ltd v London Borough of Camden & Anor [2019] EWHC 1433 (Ch) (17 May 2019) Mr Justice Marcus Smith took a very dim view indeed of an attempt by a litigant to obtain an extension…

CIVIL PROCEDURE BACK TO BASICS 42: WHY A DAY EARLY IS SO VERY DIFFERENT TO A DAY LATE: THE ROBERT CRITERIA

CIVIL PROCEDURE BACK TO BASICS 42: WHY A DAY EARLY IS SO VERY DIFFERENT TO A DAY LATE: THE ROBERT CRITERIA

May 9, 2019 · by gexall · in Applications, Avoiding negligence claims, Civil Procedure, Extensions of time, Members Content, Relief from sanctions

There is a world of different between a prospective and retrospective application to extend time, or comply with an order.   Every litigator has to know about Robert -v- Momentum Services [2003] EWCA Civ 229.  An application made in advance means that the…

"LAST KNOWN ADDRESS" : CLAIMANT HAD TAKEN REASONABLE STEPS : EXTENSION OF TIME TO SERVE CLAIM FORM UPHELD

“LAST KNOWN ADDRESS” : CLAIMANT HAD TAKEN REASONABLE STEPS : EXTENSION OF TIME TO SERVE CLAIM FORM UPHELD

March 28, 2019 · by gexall · in Applications, Members Content, Service of the claim form

In Colley V Shuker & Ors [2019] EWHC 781 (QB) Mrs Justice O’Farell upheld an order extending time for service of the claim form.  The judgment considers, but does not decide, whether the claimant had taken reasonable steps to establish…

RELIEF FROM SANCTIONS, LATE SERVICE OF NOTICE TO APPEAL AND THE LITIGANT IN PERSON

RELIEF FROM SANCTIONS, LATE SERVICE OF NOTICE TO APPEAL AND THE LITIGANT IN PERSON

March 27, 2019 · by gexall · in Appeals, Applications, Extensions of time, Litigants in person, Members Content, Relief from sanctions

In  London Borough of Hamlets v Al Ahmed [2019] EWHC 749 (QB) Mr Justice Dove set aside an order granting an appellant an extension of time for appealing.  The fact that the appellant was a litigant in person was not a…

DENTON CONSIDERED: EXTENSION ALLOWED WHEN NOTICE HAD GONE INTO SOLICITOR'S SPAM FOLDER

DENTON CONSIDERED: EXTENSION ALLOWED WHEN NOTICE HAD GONE INTO SOLICITOR’S SPAM FOLDER

March 26, 2019 · by gexall · in Appeals, Civil Procedure, Members Content, Relief from sanctions

In Adetoye v The Solicitors Regulation Authority [2019] EWHC 707 (Admin) Mr Justice Mostyn allowed an appellant an extension of time when a notice of appeal was served late.  The  delay was because the appellant had not noticed the order appealed…

AGREEING EXTENSIONS OF TIME: ADVICE FROM M' LEARNED FRIEND: "DON'T PANIC" AND BE TOTALLY CLEAR IN WHAT YOU ARE AGREEING

AGREEING EXTENSIONS OF TIME: ADVICE FROM M’ LEARNED FRIEND: “DON’T PANIC” AND BE TOTALLY CLEAR IN WHAT YOU ARE AGREEING

March 16, 2019 · by gexall · in Civil Procedure, Extensions of time, Limitation, Members Content

In his post yesterday Agreeing An Extension to the Limitation Period Nigel Poole QC dealt with some of the issues arising from the judgment in  Cowan v Foreman and ors [2019] EWHC 349 (Fam) where Mostyn J suggested it was not possible for the…

"THE DEFENDANTS DID NOT TAKE THE DIRECTIONS SERIOUSLY ENOUGH": ANOTHER RELIEF FROM SANCTIONS CASE

“THE DEFENDANTS DID NOT TAKE THE DIRECTIONS SERIOUSLY ENOUGH”: ANOTHER RELIEF FROM SANCTIONS CASE

March 6, 2019 · by gexall · in Applications, Members Content, Relief from sanctions, Sanctions

In Otuo v The Watch Tower Bible And Tract Society of Britain (Relief from Sanctions 1) [2019] EWHC 341 (QB) Mr Justice Warby granted the defendant relief from sanctions. However the observations made in relation to the conduct of litigation are…

LIMITATION AND INHERITANCE ACT CLAIMS: SOMETHING TO WATCH CAREFULLY: AGREEING "LIMITATION AMNESTY" MAY NOT BE POSSIBLE

LIMITATION AND INHERITANCE ACT CLAIMS: SOMETHING TO WATCH CAREFULLY: AGREEING “LIMITATION AMNESTY” MAY NOT BE POSSIBLE

March 4, 2019 · by gexall · in Applications, Avoiding negligence claims, Civil Procedure, Extensions of time, Limitation, Members Content

NB – THESE COMMENTS ON THE POWER TO AGREE AN AMNESTY WERE DOUBTED BY THE COURT OF APPEAL SEE THE POST HERE   In Cowan v Foreman & Ors [2019] EWHC 349 (Fam) Mr Justice Mostyn set out some importance principles in…

ORDER GRANTING TIME TO EXTEND SERVICE SET ASIDE: THE DEEMED DATE FOR SERVICE OF THE CLAIM FORM: A BLAST FROM THE PAST: STILL APPLIES TO SERVICE ABROAD

ORDER GRANTING TIME TO EXTEND SERVICE SET ASIDE: THE DEEMED DATE FOR SERVICE OF THE CLAIM FORM: A BLAST FROM THE PAST: STILL APPLIES TO SERVICE ABROAD

January 28, 2019 · by gexall · in Applications, Members Content, Relief from sanctions, Service of the claim form, Serving documents

The judgment in Punjab National Bank (International) Ltd v Srinivasan & Ors [2019] EWHC 89 (Ch) contains two interesting lessons (i) a court can always set aside an order extending time for service of proceedings; (ii) the “old” rules relating to…

TIME FOR APPEALING: ANOTHER TRICKY POINT TO WATCH: TIME RUNS FROM THE DATE OF THE DECISION AND NOT ANY LATER DATE: A HELPFUL GUIDE TO THE PROCEDURE TO BE FOLLOWED

TIME FOR APPEALING: ANOTHER TRICKY POINT TO WATCH: TIME RUNS FROM THE DATE OF THE DECISION AND NOT ANY LATER DATE: A HELPFUL GUIDE TO THE PROCEDURE TO BE FOLLOWED

January 16, 2019 · by gexall · in Appeals, Applications, Extensions of time, Members Content, Relief from sanctions

In McDonald v Rose & Ors [2019] EWCA Civ 4 the Court of Appeal highlighted an important point in relation to the time for appealing.  Time for appealing runs from the date that the decision is given, not a later date….

THE DEFENDANT'S "WRONG" APPLICATION TO DISPUTE JURISDICTION WAS STILL VALID: DEFENDANT ALLOWED EXTENSION OF TIME AND TO CORRECT APPLICATION

THE DEFENDANT’S “WRONG” APPLICATION TO DISPUTE JURISDICTION WAS STILL VALID: DEFENDANT ALLOWED EXTENSION OF TIME AND TO CORRECT APPLICATION

January 15, 2019 · by gexall · in Appeals, Applications, Civil Procedure, Extensions of time, Members Content, Service of the claim form, Serving documents

Twelve years ago, in  Hoddinott and others v Persimmon Homes (Wessex) Limited [2007] EWCA Civ 1203; [2008] 1 WLR 806, the Court of Appeal held that the correct way for a defendant to challenge the validity of a claim form was to issue…

"DENTON" PRINCIPLES DO NOT APPLY TO SECTION 33 APPLICATIONS: HIGH COURT REJECTS DEFENDANT'S ARGUMENT THAT RELIEF FROM SANCTIONS PRINCIPLES SHOULD BE APPLIED TO LIMITATION ACT

“DENTON” PRINCIPLES DO NOT APPLY TO SECTION 33 APPLICATIONS: HIGH COURT REJECTS DEFENDANT’S ARGUMENT THAT RELIEF FROM SANCTIONS PRINCIPLES SHOULD BE APPLIED TO LIMITATION ACT

December 23, 2018 · by gexall · in Limitation, Members Content, Relief from sanctions

In Ellis v Heart of England NHS Foundation Trust & Ors [2018] EWHC 3505 (Ch) HHJ McKenna (sitting in the High Court) roundly rejected an argument that the court should apply “Denton” type guidance to a claimant’s application to disapply the…

CLAIMANT CANNOT ENTER JUDGMENT AFTER ACKNOWLEDGEMENT OF SERVICE IS FILED LATE: DENTON PRINCIPLES APPLIED TO GRANT DEFENDANT EXTENSION OF TIME TO DISPUTE THE JURISDICTION

CLAIMANT CANNOT ENTER JUDGMENT AFTER ACKNOWLEDGEMENT OF SERVICE IS FILED LATE: DENTON PRINCIPLES APPLIED TO GRANT DEFENDANT EXTENSION OF TIME TO DISPUTE THE JURISDICTION

December 9, 2018 · by gexall · in Applications, Default judgment,, Extensions of time, Members Content, Relief from sanctions, Service of the claim form, Serving documents, Setting aside judgment

The judgment in Cunico Resources NV & Ors v Daskalakis & Anor [2018] EWHC 3382 (Comm) addresses several procedural issues. Firstly the much debated question of whether a claimant can obtain judgment when the defendant has acknowledged service late.  Mr Justice…

SERVICE OF THE CLAIM FORM: WHERE THINGS CAN GO WRONG FOR THE DEFENDANT: RELIEF FROM SANCTIONS REFUSED

SERVICE OF THE CLAIM FORM: WHERE THINGS CAN GO WRONG FOR THE DEFENDANT: RELIEF FROM SANCTIONS REFUSED

November 29, 2018 · by gexall · in Applications, Civil Procedure, Members Content, Relief from sanctions, Service of the claim form

There are numerous cases reported on this blog where issues relating to service of the claim form have gone wrong for claimants.  However, as we have recently seen, a failure to respond accurately and timeously to claim form issues can…

DENTON PRINCIPLES MEANS THAT APPEAL BITES THE DUST: CONFUSION AND BEING "LOST IN THE FOREST" ARE NOT GOOD GROUNDS FOR AN EXTENSION OF TIME

DENTON PRINCIPLES MEANS THAT APPEAL BITES THE DUST: CONFUSION AND BEING “LOST IN THE FOREST” ARE NOT GOOD GROUNDS FOR AN EXTENSION OF TIME

September 11, 2018 · by gexall · in Appeals, Applications, Extensions of time, Members Content, Relief from sanctions

The Denton principles are considered in detail in the judgment of Edward Murray (sitting as a High Court Judge) in Sabesan v London Borough of Waltham Forest [2018] EWHC 2373 (Admin).   The judgment confirms that the Denton principles are applicable to…

APPLYING FOR AN EXTENSION OF TIME FOR FILING A DEFENCE - AFTER THE DEFENCE IS DUE: DENTON PRINCIPLES APPLIED: FULL TRANSCRIPT NOW AVAILABLE

APPLYING FOR AN EXTENSION OF TIME FOR FILING A DEFENCE – AFTER THE DEFENCE IS DUE: DENTON PRINCIPLES APPLIED: FULL TRANSCRIPT NOW AVAILABLE

September 6, 2018 · by gexall · in Applications, Conduct, Default judgment,, Extensions of time, Members Content, Relief from sanctions

The judgment of Deputy Master Pickering in Billington v Davies & Anor [2016] EWHC 1919 (Ch) has only recently appeared on BAILLI. It raises an interesting issue of how the courts should approach the question of a late application to extend…

DON'T DELAY SERVICE OF THE CLAIM FORM JUST BECAUSE YOU DON'T HAVE THE PARTICULARS OF CLAIM: A NAIL IN THE COFFIN FOR CLAIMANTS WHO DECIDE TO WAIT

DON’T DELAY SERVICE OF THE CLAIM FORM JUST BECAUSE YOU DON’T HAVE THE PARTICULARS OF CLAIM: A NAIL IN THE COFFIN FOR CLAIMANTS WHO DECIDE TO WAIT

August 21, 2018 · by gexall · in Appeals, Applications, Civil Procedure, Extensions of time, Members Content, Service of the claim form

There is another aspect of the judgment in Phoenix Healthcare Distribution Ltd v Woodward & Anor [2018] EWHC 2152 (Ch) that needs highlighting. The lesson here is clear:  you cannot delay service of the claim form on the grounds that you…

NO DUTY ON A PARTY TO INFORM AN OPPOSING PARTY THEY ARE MAKING AN ERROR: THE APPEAL JUDGMENT IN PHOENIX IN FULL:

NO DUTY ON A PARTY TO INFORM AN OPPOSING PARTY THEY ARE MAKING AN ERROR: THE APPEAL JUDGMENT IN PHOENIX IN FULL:

August 21, 2018 · by gexall · in Civil Procedure, Members Content, Service of the claim form, Serving documents

I have already noted that the judgment at first instance in  Woodward & Anor v Phoenix Healthcare Distribution Ltd [2018] EWHC 334 (Ch) has been overturned. The full appeal judgment is now available on BAILLI at [2018] EWHC 2152 (Ch), a decision of HH…

THE IMPORTANCE DIFFERENCE BETWEEN PROSPECTIVE AND RETROSPECTIVE APPLICATIONS TO EXTEND TIME: THE IMPORTANCE OF THE DATE OF THE APPLICATION

THE IMPORTANCE DIFFERENCE BETWEEN PROSPECTIVE AND RETROSPECTIVE APPLICATIONS TO EXTEND TIME: THE IMPORTANCE OF THE DATE OF THE APPLICATION

May 29, 2018 · by gexall · in Applications, Extensions of time, Members Content, Relief from sanctions

This post is caused by a search term that arrived on this blog today “Is an application for an extension of time an application for relief from sanctions?”. The short answer to that is – it depends.  An application made after…

COURT OF APPEAL UPHOLDS REFUSAL OF EXTENSION OF TIME IN FOREIGN JUDGMENTS CASE: JUDGMENT TODAY

COURT OF APPEAL UPHOLDS REFUSAL OF EXTENSION OF TIME IN FOREIGN JUDGMENTS CASE: JUDGMENT TODAY

March 9, 2018 · by gexall · in Appeals, Applications, Extensions of time, Members Content, Relief from sanctions

A post in 2015 looked at the decision in In Christofi -v- National Bank of Greece (Cyprus) Ltd [2015] EWHC 986 (QB) Mrs Justice Andrews DBE held that there were very limited grounds for extending time in an appeal against the registration of…

EXTENSIONS OF TIME FOR SERVICE WERE PROPERLY GRANTED: APPLICATIONS TO SET ASIDE ARE A REHEARING NOT A REVIEW: HIGH COURT DECISION

EXTENSIONS OF TIME FOR SERVICE WERE PROPERLY GRANTED: APPLICATIONS TO SET ASIDE ARE A REHEARING NOT A REVIEW: HIGH COURT DECISION

February 27, 2018 · by gexall · in Appeals, Extensions of time, Members Content, Service of the claim form

Another week, another case about service of the claim form. This time the claimant was more successful. In DDM v Al-Zahra (PVT) Hospital & Ors [2018] EWHC 346 (QB). Mr Justice Foskett allowed an appeal against a Master’s decision setting aside…

DENTON APPLIED TO LATE APPEAL: SUBMITTING SUBMISSIONS AFTER A HEARING AND THE NEED FOR CAUTION WHEN SEEKING DAMAGES UNDER THE HUMAN RIGHTS ACT

DENTON APPLIED TO LATE APPEAL: SUBMITTING SUBMISSIONS AFTER A HEARING AND THE NEED FOR CAUTION WHEN SEEKING DAMAGES UNDER THE HUMAN RIGHTS ACT

February 2, 2018 · by gexall · in Appeals, Applications, Damages, Extensions of time, Members Content, Relief from sanctions

In Fayad, R (On the Application Of) v The Secretary of State for the Home Department [2018] EWCA Civ 54 the Court of Appeal applied the Denton principles to a late appeal.  Permission to appeal was refused. Mr Justice Singh had…

THE PERILOUS STRATEGY OF SERVING  EVIDENCE  LATE: DENTON APPLIES:  A RELEVANT FACTOR IN A SUMMARY JUDGMENT APPLICATION

THE PERILOUS STRATEGY OF SERVING EVIDENCE LATE: DENTON APPLIES: A RELEVANT FACTOR IN A SUMMARY JUDGMENT APPLICATION

January 28, 2018 · by gexall · in Applications, Extensions of time, Members Content, Relief from sanctions, Sanctions, Summary judgment, Witness statements

The case of  Crown House Technologies Ltd v Cardiff Commissioning Ltd & Anor [2018] EWHC 54 (TCC) highlights the dangers of waiting to serve evidence until the last moment. If it is served late then a party requires permission of the…

COURT ORDER ALLOWING PROSPECTIVE AND RETROSPECTIVE EXTENSIONS OF TIME: A BRIEF EXAMPLE

COURT ORDER ALLOWING PROSPECTIVE AND RETROSPECTIVE EXTENSIONS OF TIME: A BRIEF EXAMPLE

January 25, 2018 · by gexall · in Applications, Case Management, Civil Procedure, Extensions of time, Members Content

I am grateful to Dominic Regan for providing a precedent that allows the parties to extend time for compliance prospectively and retrospectively. THE ISSUE During a discussion on Twitter Dominic mentioned that some courts were habitually making orders that allowed…

FIRST CLAIM FORM CASE OF THE YEAR: THE DANGERS OF LEAVING SERVICE UNTIL THE LAST MINUTE

FIRST CLAIM FORM CASE OF THE YEAR: THE DANGERS OF LEAVING SERVICE UNTIL THE LAST MINUTE

January 17, 2018 · by gexall · in Civil Procedure, Members Content, Relief from sanctions, Service of the claim form, Serving documents

It is the middle of January (bluebells nowhere in sight) and we have already have a claim form case to consider.  In  Kennedy v The National Trust for Scotland [2017] EWHC 3368 (QB) Sir David Eady considered whether service (at the…

SEEKING AN EXTENSION OF TIME - WHEN YOU ARE 9 1/2 YEARS LATE: THE IMPORTANCE OF A SOLICITOR KEEPING A RECORD

SEEKING AN EXTENSION OF TIME – WHEN YOU ARE 9 1/2 YEARS LATE: THE IMPORTANCE OF A SOLICITOR KEEPING A RECORD

January 9, 2018 · by gexall · in Applications, Limitation, Members Content, Uncategorized, Witness statements

Section 4 of the Inheritance (Provision for Family and Dependants) Act 1975 provides that a claim under the Act should normally be brought within six months of the date on which representation is taken out.  An action brought at a…

PERMISSION TO APPEAL - TWO YEARS OUT OF TIME - SET ASIDE: COURT WAS "MISLED BY SERIOUS MISREPRESENTATIONS AND NON DISCLOSURES"

PERMISSION TO APPEAL – TWO YEARS OUT OF TIME – SET ASIDE: COURT WAS “MISLED BY SERIOUS MISREPRESENTATIONS AND NON DISCLOSURES”

October 11, 2017 · by gexall · in Appeals, Applications, Extensions of time, Members Content

In Kovarska v Otkritie International Investment Management Ltd & Ors [2017] EWCA Civ 1485 the Court of Appeal set aside an extension of time for appealing.  The order had been granted without a hearing. It was held that the Court…

ACCEPTING A PART 36 OFFER DURING A TRIAL: A MATTER OF JUDICIAL DISCRETION:  CLAIMANTS HAD LOST THEIR CHANCE

ACCEPTING A PART 36 OFFER DURING A TRIAL: A MATTER OF JUDICIAL DISCRETION: CLAIMANTS HAD LOST THEIR CHANCE

October 5, 2017 · by gexall · in Civil Procedure, Members Content, Part 36

I am grateful to barrister Simon Mills for sending me a copy of the judgment of Mr Justice Morgan in Houghton (Stanley) -v- P.B. Donaghue (Haulage & Plant Hire Ltd & Ors) 2017] EWHC 1738 (Ch). It relates to the question…

SERVICE OF PROCEEDINGS WITHOUT PERMISSION: THE COURT HAS POWER TO RECTIFY THE POSITION RETROSPECTIVELY

SERVICE OF PROCEEDINGS WITHOUT PERMISSION: THE COURT HAS POWER TO RECTIFY THE POSITION RETROSPECTIVELY

September 6, 2017 · by gexall · in Applications, Extensions of time, Members Content, Service of the claim form, Serving documents

Can the court rectify the situation when a claimant, who requires permission to continue proceedings, has issued and served without such permission? That was the question considered by His Honour Judge Davis-White QC in Wilton UK Ltd v Shuttleworth & Ors…

WHY LIFE IS NOW  DANGEROUS FOR DEFENDANTS (ESPECIALLY THOSE WHO DON'T FILE A DEFENCE ON TIME)

WHY LIFE IS NOW DANGEROUS FOR DEFENDANTS (ESPECIALLY THOSE WHO DON’T FILE A DEFENCE ON TIME)

July 21, 2017 · by gexall · in Applications, Default judgment,, Extensions of time, Members Content, Relief from sanctions, Summary judgment

The judgment of Mr Justice Coulson in ADVA Optical Networking Limited -v- Optron Holding Limited  [2017] EWHC 1813 (TCC) highlights what a dangerous world this can be for defendants. A defendant who is late filing a defence, and where judgment has not been…

AGREEING EXTENSIONS OF TIME: REFUSAL TO AGREE CONTRARY TO THE OVERRIDING OBJECTIVE HAS CONSEQUENCES IN COSTS

AGREEING EXTENSIONS OF TIME: REFUSAL TO AGREE CONTRARY TO THE OVERRIDING OBJECTIVE HAS CONSEQUENCES IN COSTS

June 5, 2017 · by gexall · in Applications, Costs, Extensions of time, Members Content

When should a party agree an extension of time? In Emmanuel -v- The Commissioners for Her Majesty’s Revenue and Customs [2017]  EWHC 1253 (Ch)  Her Honour Judge Karen Walden Smith made some telling observations . “… in my judgment the…

DELAY, DENTON, APPEALS AND CROSS-APPEALS: EXTENSION OF TIME WOULD HAVE BEEN GRANTED

DELAY, DENTON, APPEALS AND CROSS-APPEALS: EXTENSION OF TIME WOULD HAVE BEEN GRANTED

April 13, 2017 · by gexall · in Appeals, Extensions of time, Members Content, Relief from sanctions

In Pinisetty -v-Manikonda [2017] EWHC 838 (QB) Mr Justice Langstaff considered an issue relating to an appeal (and cross-appeal)  being out of time. Although the judgment on this issue is largely academic (the appeal failed in any event), it contains…

RELIEF FROM SANCTIONS GRANTED AFTER SECRETARY OF STATE RELIED UPON AN OUTDATED REFERENCE IN THE WHITE BOOK

RELIEF FROM SANCTIONS GRANTED AFTER SECRETARY OF STATE RELIED UPON AN OUTDATED REFERENCE IN THE WHITE BOOK

March 26, 2017 · by gexall · in Appeals, Extensions of time, Members Content, Relief from sanctions

In AM (Pakistan) -v- Secretary of State for the Home Department [2017] EWCA Civ 180 the Court of Appeal granted relief after an appeal was filed late.  The appellant had relied upon an out of date commentary in the white…

WHAT A DIFFERENCE A DAY MAKES: ACTION BROUGHT IN TIME:  COURT'S EARLIER REFUSAL TO EXTEND DISCRETION TO EXTEND TIME OVERTURNED

WHAT A DIFFERENCE A DAY MAKES: ACTION BROUGHT IN TIME: COURT’S EARLIER REFUSAL TO EXTEND DISCRETION TO EXTEND TIME OVERTURNED

March 9, 2017 · by gexall · in Appeals, Applications, Limitation, Members Content

The judgment of the Court of Appeal in Otuo -v- Watchtower Bible and Tract Society of Britain [2017] EWCA Civ 136 shows the importance of calculating time periods for limitation. It shows what a difference a day makes KEY POINTS…

EXTENSIONS OF TIME UNDER THE HUMAN RIGHTS ACT:  LATE APPLICATION REFUSED

EXTENSIONS OF TIME UNDER THE HUMAN RIGHTS ACT: LATE APPLICATION REFUSED

February 28, 2017 · by gexall · in Limitation, Members Content

In MLIA -v- The Chief Constable of Hampshire Police [2017] EWHC 292 (QB) Mr Justice Lavender refused the claimants’ applications for an extension of time to bring their actions under the Human Rights Act. THE CASE The claimants brought an…

THE DUTY OF FULL DISCLOSURE ON WITHOUT NOTICE APPLICATIONS: ANOTHER EXAMPLE OF PROBLEMS OCCURRING

February 3, 2017 · by gexall · in Applications, Extensions of time, Members Content, Service of the claim form

The New Year’s resolution for litigators that I recommended this year came (apparently) as a surprise to many: “Think very carefully before, during and after, making an ex parte application of any kind.”  The judgment of Mrs Justice Andrews DBE…

LIMITATION, EXTENSIONS AND THE HUMAN RIGHTS ACT: COURT OF APPEAL SAYS NO

January 26, 2017 · by gexall · in Appeals, Extensions of time, Limitation, Members Content

For the second time within a week we have a case where the courts consider the discretion to extend time under s.7(5)(a) of the Human Rights Act 1998.  In London Borough of Hackney -v- Williams [2017] EWCA Civ 26 the…

MINISTRY OF DEFENCE REFUSED EXTENSION OF TIME TO COMPLY WITH PEREMPTORY ORDER: ORDERS ARE ORDERS

November 24, 2016 · by gexall · in Applications, Disclosure, Extensions of time, Members Content, Relief from sanctions, Uncategorized

In Eaglesham -v- Ministry of Defence [2016] EWHC 3011 (QB) Mrs Justice Andrews DBE refused the defendant’s application for an extension of time for compliance with an unless order. The Defence was struck out. “A party who faces genuine difficulties…

WITNESS CREDIBILITY, DELAY AND DENTON.

November 2, 2016 · by gexall · in Applications, Extensions of time, Members Content, Relief from sanctions, Uncategorized, Witness statements

There is an interesting discussion of  the credibility  of witnesses in the judgment of Mr Registrar Briggs in Preston -v- Green (Liquidator of Cre8atsea Limited) [2016] EWHC 25222 (Ch). The Registrar also had to consider whether to exercise his discretion…

IF THE DEFENCE IS FILED LATE THE CLAIMANT IS STILL ENTITLED TO DEFAULT JUDGMENT: TWO POINTS TO WATCH

September 8, 2016 · by gexall · in Applications, Default judgment,, Extensions of time, Members Content, Relief from sanctions, Setting aside judgment, Uncategorized

NB THIS DECISION HAS SINCE BEEN OVERTURNED BY A CHANGE IN THE RULES, SEE THE POST HERE. The decision of Deputy Master Pickering in Billington -v- Davies [2016] EWHC 1919 (Ch) illustrates two important principles that are often overlooked. A…

ANOTHER CLAIM FORM CASE: WHY IT CAN BE DANGEROUS FOR A DEFENDANT TO TAKE TECHNICAL POINTS

July 15, 2016 · by gexall · in Civil Procedure, Members Content, Service of the claim form, Serving documents, Uncategorized

The decision of Master Mathews in DB UK Bank Limited -v- Sinclair Solicitors [2015] EWHC B29 (Ch) has today been reported on Bailli.  It is a case that shows the dangers of taking technical points as to service. “if I…

EXTENDING TIME FOR SERVICE OF A CLAIM FORM: PROSECCO MAY HELP

May 12, 2016 · by gexall · in Appeals, Extensions of time, Insolvency, Members Content, Service of the claim form, Uncategorized

There have been numerous cases relating to extension of the claim form on this blog. I can’t remember one which ended well for the claimant.  However the claimant was successful in the Instone -v- Prosecco (Leeds) LImited [2016] EW Misc…

LATE SERVICE OF NOTICE OF APPEAL: COUNSEL'S ERROR DOES NOT AMOUNT TO A GOOD REASON

May 5, 2016 · by gexall · in Appeals, Applications, Extensions of time, Members Content, Relief from sanctions, Uncategorized

In the judgment today in Turner -v- South Cambridgeshire District Council [2016] EWHC 1017(Admin)Mr Justice Warby considered the Denton guidance in relation to an application to appeal out of time. Among other factors he rejected the idea that an error…

MORE ABOUT SERVICE OF THE CLAIM FORM: GOOD REASONS, DELAY AND A FAILURE TO PAY THE PROPER COURT FEES

April 15, 2016 · by gexall · in Applications, Civil evidence, Limitation, Members Content, Service of the claim form, Uncategorized

In TMT Asia LImited -v- BHP Billiton Marketing AG [2016] EWHC 287 (Ch) Mr Justice Burton considered several issues relating to late service of the claim form and failure to pay the correct court fee. KEY POINTS The defendant’s application…

"IN TIME" APPLICATION TO EXTEND TIME FOR PEREMPTORY ORDER REFUSED: CLAIM STRUCK OUT

April 15, 2016 · by gexall · in Applications, Civil Procedure, Extensions of time, Members Content, Peremptory orders, Relief from sanctions, Uncategorized

I am grateful to Charles Bagot of Hardwicke Chambers for bringing my attention to the decision in Kranniqi -v- Watford Timber Company Ltd (District Judge Parfitt 13/04/2016). It is a working example of (i)the dangers of failing to comply with…

DENTON DOES NOT APPLY TO DELAY IN PROVISIONAL ASSESSMENT

March 5, 2016 · by gexall · in Applications, Assessment of Costs, Case Management, Costs, Extensions of time, Members Content, Relief from sanctions, Uncategorized

I am grateful to Simon Anderson of Park Square Barristers for his note of the judgment of Deputy District Judge Hill yesterday (4th March 2016) in the case of Martin -v- The Leeds Teaching Hospitals NHS Trust. This decision is…

THERE IS NO SPECIAL RULE FOR PUBLIC AUTHORITIES: SECRETARY OF STATE NOT GRANTED PERMISSION TO APPEAL OUT OF TIME

March 3, 2016 · by gexall · in Appeals, Applications, Extensions of time, Members Content, Relief from sanctions, Uncategorized

The previous post emphasised the point that state agencies have no preferred status when it comes to compliance with rules and relief from sanctions. This point was made clear again by the Court of Appeal judgment in The Secretary of…

EXTENDING TIME FOR SERVICE OF THE CLAIM FORM: A RISKY BUSINESS

January 28, 2016 · by gexall · in Applications, Avoiding negligence claims, Case Management, Civil Procedure, Extensions of time, Members Content, Service of the claim form, Uncategorized

In Medhi Kohsravi -v- British American Tobacco PLC [2016] EWHC 123 (QB)Sir David Eady stated that he would have set aside an order extending time for service of the claim form. It is a timely warning that obtaining an extension…

WAITING FOR LEGAL AID IS NOT A GOOD REASON FOR DELAY: COURT OF APPEAL DECISION

December 14, 2015 · by gexall · in Appeals, Applications, Members Content, Relief from sanctions, Uncategorized

In R (Kigen) -v- Secretary of State for the Home Department [2015] EWCA Civ 1286 the Court of Appeal stated that delay caused by waiting for the Legal Aid Agency may no longer be accepted as a good reason for…

← Previous 1 2 3 4 Next →

Subscribe to Blog via Email

Enter your email address to subscribe to this blog and receive notifications of new posts by email. Subscription notifies you of a new post, it does not give you access to members' content.

Join 12.3K other subscribers

Recent Posts

  • EXPERT WATCH 82: THE PROFOUND DANGERS OF AN EXPERT USING AI: “A SIGNIFICANT GAP BETWEEN THE VOICE AND OPINION OF THE EXPERT AND THE REPORT WHICH SHE HAS FILED”
  • SERVICE POINTS 58: ACCIDENT IN ENGLAND, CLAIMANTS LIVING IN AUSTRALIA: DEFENDANT’S APPLICATION TO CHALLENGE JURISDICTION REFUSED
  • EXPERT WATCH 81: EXPERT EVIDENCE ON APPEAL: COMPANY PERMITTED TO RELY ON IT EXPERT TO EXPLAIN WHY ITS DIRECTORS THOUGHT A REGULATOR’S EMAIL WAS A PHISHING ATTEMPT
  • THROWBACK FRIDAY: IN THE RUN UP TO HALLOWEEN: MISSIVES FROM THE BENCH (OCTOBER 2021): “THAT ONE’S HALF BLIND AND HALF DEAF. I CALL HIM THE COURT OF APPEAL…”
  • THE DEFENDANT SHOULD NOT PICK AND CHOOSE THE EVIDENCE IT PUTS BEFORE THE COURT: A WITNESS STATEMENT BREACHED THE DUTY OF CANDOUR OWED: WHAT YOU LEAVE OUT CAN SOMETIMES BE MORE IMPORTANT THAT WHAT YOU PUT IN…

Top Posts

CLAIMANT'S CLAIM AGAINST INSURER FAILS: COURT OF APPEAL UPHOLD DECISION THAT THE INSURED'S FAILURE TO NOTIFY WAS A CONDITION PRECEDENT
"THIS IS NOT THE MANNER IN WHICH AN APPLICATION SHOULD BE MADE": EMAILS TO THE COURT CANNOT TAKE THE PLACE OF APPLICATIONS
NO FINDING OF FUNDAMENTAL DISHONESTY WHERE A CLAIMANT GAVE AN ACCOUNT DIFFERENT TO HER LETTER OF CLAIM: (CLINICAL NEGLIGENCE CASE)
NON-COMPLIANT CLAIMANTS ARE IN THE LAST CHANCE SALOON (AND THERE ARE 5,000 OF THEM): BUT PARTICULARS MUST BE SERVED AND ADVERSE COSTS STILL PAID
SERVICE POINTS 57: PRESENCE IN THE JURISDICTION, A LAST KNOWN ADDRESS AND THE COST OF GETTING IT WRONG: UNSUCCESFUL CLAIMANT FACES A COSTS BILL OF £500,000...

Archives

Blogroll

  • Fatal Accident Law
  • Legal Futures
  • Personal injury: Liability and Damages

Books

  • Munkman & Exall on Damages for Personal Injuries and Death 15th ed
  • The APIL Guide to Fatal Accidents 4th edition

Useful Links

  • Buntools (for preparing PDF Bundles)
  • Kings Chambers
  • Kings Chambers Costs & Litigation Funding
  • Kings Chambers Serious Injury
  • The Civil Procedure Rules
  • The Law Society Gazette
  • The National Archives Recently Published Judgments
  • The Senior Court Costs Office Guide 2025
  • www.Bailii.org

Copyright

© Gordon Exall, Exall Legal Training, Civil Litigation Brief, 2013-2026. Unauthorised use and or duplication of the material contained on this blog without permission is strictly prohibited.
Privacy & Cookies: This site uses cookies. By continuing to use this website, you agree to their use.

To find out more, including how to control cookies, see here: Cookie Policy
  • Membership Terms and Conditions
  • Privacy Policy
  • Advertising Policy
  • Copyright
  • Legal Disclaimer

Copyright © 2026 Civil Litigation Brief ®

Powered by Big Yellow Workshop

Loading Comments...

You must be logged in to post a comment.